Lift Installation Manual [cracked] — Thyssenkrupp Levant Stair
Regular, annual maintenance by a qualified technician is highly recommended to inspect electrical components and mechanical wear.
Before installing the ThyssenKrupp Levant stair lift, ensure:
1. Remove End Stops -> 2. Slide Chassis Onto Rail -> 3. Reinstall End Stops & Chargers
Lower the seat assembly onto the chassis seat post. Align the orientation splines and tighten the nylon-locking retention bolt to secure the seat. Connect the wire harness from the seat (seat switch and armrest controls) to the main circuit board on the chassis. 5. Electrical Connections and Charging System thyssenkrupp levant stair lift installation manual
Locate a standard 220/240V wall socket near the top or bottom for the transformer.
The Levant features sensitive safety edges on the footrest and the sides of the carriage. Drive the lift in one direction using the armrest toggle. While it is moving, gently press the edge of the footrest. The lift must stop instantly.
A metric set (4mm to 8mm) for adjustment screws. Regular, annual maintenance by a qualified technician is
Slide the jointing clamps into the rail grooves to connect sections, ensuring they are evenly spaced and tightened.
Verify the voltage is approximately before final connection.
Heavy-duty steel brackets used to anchor the rail to the stair treads. Slide Chassis Onto Rail -> 3
If you are not a , do not proceed beyond step 2. Call a ThyssenKrupp-certified installer – the Levant is a precision mechanical/electrical system, and incorrect installation can lead to serious falls or entrapment .
The Levant's design prioritizes reliability and ease of use. It is powered by a rechargeable battery system, ensuring operation even during a power outage. The system comprises a drive unit, a foldable seat, a foldable footrest, and an aluminum rail that is securely fixed to the stair treads.
Deburr all cut edges with a metal file to prevent the internal wiring from snagging or chafing during operation.
