The is a mandatory compliance checklist used in Dubai’s special development zones (such as JAFZA and Dubai Maritime City) to ensure construction sites meet safety and environmental standards before major work begins. It must be submitted after the site is established but before starting construction activities. Core Requirements for COC 1
"Form 1," Zayn panted, sliding the paper through. "Exclusive. For the cold storage in Maritime City. Unit 4B."
: A dedicated Safety Advisor or Safety Supervisor must be assigned on-site. This individual must possess a valid Trakhees registration card, specifically a Safety Advisor Registration Card (SARS) or Safety Supervisor Registration Card (SSRS).
The COC 1 form includes a checklist of approximately 15 health and safety requirements and 4 green building requirements that must be confirmed ("Yes," "No," or "N/A"): Site Safety & Logistics: trakhees coc 1 form exclusive
Trakhees oversees development across major commercial, residential, and industrial hubs in Dubai. If your project is located in any of the following zones, obtaining the COC 1 form is mandatory:
Rumors of a unified “UAE COC” have circulated, but as of now, Trakhees has confirmed that due to the unique regulatory needs of free zones (e.g., customs duty suspension, VAT treatment), the COC 1 form will retain its exclusive status.
Procedural exclusivity highlights the unique jurisdiction of Trakhees. Businesses operating under the jurisdiction of PCFC must utilize this specific Trakhees format, distinct from forms used in mainland Dubai or other emirates. This exclusivity allows Trakhees to maintain a self-contained regulatory ecosystem. By mandating a specific form, Trakhees ensures that the data collected is standardized to its own advanced digital platforms, facilitating a seamless interface between the importer, the conformity assessment body, and customs authorities. The is a mandatory compliance checklist used in
: The main contractor must install a high-quality project signboard and a secure fence around the entire site perimeter, equipped with functional security gates at the entry points.
Trakhees is the regulatory arm responsible for approving construction activities within certain free zones and maritime areas. The COC 1 Form (Certificate of Compliance — Stage 1) is a mandatory submission that initiates the approval process for building works. A well-prepared essay on the Trakhees COC 1 Form should explain its purpose, required documentation, submission process, common pitfalls, and recommendations for applicants.
: Approval generally takes 7 to 15 working days , depending on project complexity and the accuracy of the submitted documentation. "Exclusive
CoC Form 1 is the first certificate you must obtain. It is required before any construction, fit‑out, or renovation work commences in a Trakhees‑controlled zone. This applies to:
The is a mandatory compliance document used by the Ports, Customs, and Free Zone Corporation (PCFC) Trakhees in Dubai. It serves as a formal declaration by the main contractor and supervising consultant that a construction site meets specific Environmental, Health, and Safety (EHS) requirements during the initial stages of a project. Core Purpose
Within this framework, the Civil Engineering Department (CED) and EHS division supervise every phase of a project's life cycle. The PCFC Digital Portal lists sequential milestone clearances, categorized as COC-1, COC-2, and COC-3 forms, to manage risk dynamically as structural heights change.
Signed and stamped by the appointed approved consultant and the client.
Once submitted, the system generates a payment advice note based on the project’s total built-up area (BUA) or the scope of the fit-out. Pay the inspection and administrative fees online via the Trakhees e-wallet or credit card to activate the review process. Step 3: Technical Review and Site Inspection